Ashtrom Chosen for MUSE's First Tower, With 134 Homes Near Hayarkon Park

The MUSE residential development in north Tel Aviv has a contractor for its first tower. Phoenix and America Israel signed an agreement with Ashtrom worth approximately NIS 370 million for a planned 34-story building containing 134 apartments. Reports published on October 4 say work is expected to start soon, but the material reviewed does not establish a precise occupancy date.
The development is around the junction of Namir Road and Rokach Boulevard, opposite Hayarkon Park and near the Eretz Israel Museum. The new agreement concerns one stage. It should not be read as confirmation that every planned home is already under construction, sold or due to become available at the same time.
What the construction agreement covers
According to the report on the developers' announcement (opens in a new tab), Ashtrom will build the first tower. The approximately NIS 370 million figure describes that construction agreement. It is not the land price, the value of apartments already sold or the eventual sales value of the whole development.
That distinction matters because several large numbers accompany the project. Apartment counts describe the scale of housing. The construction contract describes an agreement with a builder. A sales projection describes what the developers expect. They answer different questions and should not be treated as interchangeable measures of progress.
The phrase “soon” also leaves important details unresolved. The reports used for this article do not give specific dates for mobilization, structural completion or handing over keys. A contractor appointment is a meaningful step, but it does not establish when an individual buyer can move in or when a home might enter the rental market.
The first tower is part of a larger scheme
The full development is described as approximately 450 homes in three 34-story towers, together with lower-rise buildings. The 134 apartments in the first tower form only part of that total. The current contract should not be turned into a claim that the entire scheme will be completed in a single phase.
For neighbors, construction has a different set of practical questions from those facing buyers: site entrances, working hours and any announced traffic arrangements. The reviewed material does not establish those details. There is no basis here to announce a particular road closure or bus diversion associated with MUSE.
The location places the project near a major park, transport corridors and cultural institutions. For international readers, Hayarkon Park is the large urban park along the Yarkon River. The nearby Eretz Israel Museum uses the MUZA name, which should not be confused with the residential project's MUSE branding. A shared sound does not make them the same institution or development.
Starting prices and penthouses are different evidence
The marketing figures reported start at approximately NIS 4.15 million. The published mix includes apartments described in Israel as two to six rooms, alongside special units. Israeli room counts commonly include the living room, so international buyers should check floor plans instead of assuming that every advertised room is a bedroom.
A starting price identifies the bottom of an advertised range. It does not establish that every apartment type is offered at that amount or that the relevant unit remains available. Size, floor, orientation and specification can all differ between the homes being compared. The article does not provide a live inventory or an independently checked quotation for a particular apartment.
Separately, project-related reporting describes a penthouse sale of approximately NIS 23.2 million. That is a reported transaction at another end of the housing mix, not an average price for the tower. Published per-square-meter calculations also vary. Without a consistent area definition, including the treatment of terraces and ancillary space, a precise comparison risks creating a false impression.
The NIS 4.4 billion figure is a projection
The developers estimate total eventual sales at approximately NIS 4.4 billion. This is their forecast for the overall project. It is not a statement that the money has already been received or that signed apartment contracts already total that amount.
The reviewed reports do not provide enough detail on sales velocity, remaining inventory or the proportion of homes under contract to support a judgment about whether demand is exceeding or falling short of expectations. A construction announcement cannot settle those separate questions. Nor does a high-profile penthouse transaction establish the pace at which the rest of the apartments are selling.
The next useful details will be specific
For an interested buyer, the announcement supplies the identity of the contractor and the scope of the first phase. An individual decision still needs the relevant apartment plan, current price, specification and documented delivery terms. General claims about prestige or location cannot supply information missing from a particular offer.
For residents nearby, the next useful update will be a concrete start notice and site arrangements. Until those are available, the accurate description is that an agreement has been signed to build the first tower. That is progress in the project, while completion and occupation remain later milestones with their own dates and evidence.



